Construction & Safety Products Structural Building Materials
Construction system for forming cast in place concrete structure of a building
USD 150 per Unit
Buy Sample
Less Construction Budget
FORMiS formwork system has advanced dismantling system. The formworks can be removed in 2~3
working cycle days per floor. It will definitely save our client’s labor cost and construction
period. FORMiS formwork system can be reused more than 200 times.
Therefore, the client saves more money every time when the formworks are reused.
Premium Quality
FORMiS formwork system is made through extrusion process. The surface of concrete wall or slab
will be flat and smooth. It does not require any heavy plaster work. As a result, it even saves cost on
plaster.
Short Construction Period
The installation and dismantlement of FORMiS formwork system are easy. Our clients don’t have to
have specialized skills compared to other formwork system. Working cycle is only 2~3 days per floor.
Reliable Safety
FORMiS formwork system provides wider and cleaner working environment compared to other
construction sites. Light weight of FORMiS formwork system is great in mobility, and the convenient
installation process of FORMiS formwork system ensures the safety for workers during the installation
and disassembly.
Category | Main Item |
---|---|
|
|
CEO | LIMHYEKYUNG |
---|---|
Foundation Year | 2021 |
Annual sales(per year) | Less than 1 million dollar |
Employees | Under 50 |
Homepage | http://www.formis-korea.com |
Address | (14348) 경기 광명시 일직로 72 |
Company Introduction |