TITLE

Other Structural Building Housing Formwork

Construction & Safety Products Structural Building Materials

  • Model Name

  • Specification

  • Color

  • Introduction

    Construction system for forming cast in place concrete structure of a building

  • Certification
  • Price

    USD 150 per Unit

INQUIRY

Buy Sample

Less Construction Budget

FORMiS formwork system has advanced dismantling system. The formworks can be removed in 2~3 

working cycle days per floor. It will definitely save our client’s labor cost and construction 

period. FORMiS formwork system can be reused more than 200 times. 

Therefore, the client saves more money every time when the formworks are reused. 

Premium Quality

FORMiS formwork system is made through extrusion process. The surface of concrete wall or slab 

will be flat and smooth. It does not require any heavy plaster work. As a result, it even saves cost on 

plaster. 

Short Construction Period

The installation and dismantlement of FORMiS formwork system are easy. Our clients don’t have to 

have specialized skills compared to other formwork system. Working cycle is only 2~3 days per floor.

Reliable Safety

FORMiS formwork system provides wider and cleaner working environment compared to other 

construction sites. Light weight of FORMiS formwork system is great in mobility, and the convenient 

installation process of FORMiS formwork system ensures the safety for workers during the installation 

and disassembly.